The walls are built and the sheathing is on!
Once they put the white protective paper, the siding/trim people start working
These are the extra big stairs we ordered, I was SO excited to see them installed- well worth all the effort and stress they caused!
Windows were installed- they took much longer than we anticipated... about 4 days, they systematically installed with siding around house.

Ryan showing off the interior walls that were built
Me showing off the interior details, like the master tub surround!

Lower level is complete, special flooring is installed and ready for living!

Siding and windows complete!


This is how they installed the siding and windows, a scaffold, nailing everything up- piece by piece.


The house really started taking shape! Next is the rest of the exterior- roof and brick, and we can finally start plumbing, HVAC, and electrical.